Mold Remediation

Mold Remediation Atlanta



Phases of Water Damage Service Atlanta standard mold remediation.

1. Project Development

It is vital to calculate the extent of the damage caused by mold. Developing a sensible project plan for clean up and mold remediation in the first phase can greatly decrease microbial growth and spreading problems during whole process.

2. Preparation

Removal of all items including furniture from the infected area prior to setting up containment. If items are moved from one room to another they must be HEPA vacuumed, and cleansed with mold inhibiting chemicals. Extreme situations may require that all items/furniture in the infected area be cleaned under negative air pressure before anything can be moved.

3. Containment

Sealing off the work area by covering floor and door openings with polyethylene sheeting prevents contaminants (toxic mold) from spreading to the rest of the building.

4. Structural Removal & Cleanup

Removing and sanding growth areas on building materials such as drywall, plywood, insulation, framing etc.. Removal of damaged materials is executed under negative air pressure through HEPA filtration. Bagging and disposal of waste. During this process Alpine Air crew will use disposable coveralls and respirators with HEPA filters for protection against toxic mold.

5. Anti-Microbial Application

Applying mold inhibiting chemicals to exposed surfaces prevents the re-growth of toxic mold. A remediation verification can be requested at this point to approve the accomplishment of the project.

6. Restoration

Providing reconstruction services. If moisture is present dehumidification systems are used until all exposed areas are dry. New materials can then be installed, restoring the area to its original, purified state.

Please CALL for more information about Mildew / Mold Removal.

  • CONTACT US

  •  

    May 2012
    M T W T F S S
    « Mar    
     123456
    78910111213
    14151617181920
    21222324252627
    28293031